该项目是后英集团贯彻落实国家“双碳”战略、加快超低排放改造的关键举措,也是推动绿色化、智能化转型的重要实践。
On October 19th, the HBIS-POSCO automobile plate joint venture project, which was built by TSIC and
Li Feng, General Manager of Tangshan Qianchen Metal Materials Company, and his party visited TSIC an
2020
On March 25th, Chen Liping, deputy general manager of TSIC, went to the site of each EPC project to supervise and inspect the epidemic prevention and control and resume work.
2019
TSIC was presented with a banner by Tangshan Ytian Jinzhou Industrial co., Ltd., the owner, which praised TSIC for its 'exquisite design
2019
With its leading technical strength and service concept, TSIC as the international engineering technology enterprise has made a “technical contribution” for the rebirth of Smederrevo Steel.
2017
On August 1st, the TSIC General Contracting Project, the primary material yard enclosure project in the north area of Tangshan Iron Works, completed the steel structure grid installation and entered the completion sprint stage.
2017
The pollution comprehensive treatment and upgrading project of Tangshan Medium and Heavy Plate Company's Material yard is the key environmental protection treatment project for TSIC.
2017
On May 15, no. 6 zinc-plating line of the second phase of tanggang high-strength automobile plate technical transformation project was completed according to the network plan, and successfully entered the load linkage test stage.